Premier L4-150 2.5L (1988)
Fig. 13 Removing Wire From Gearshift Lever Pulley
24. Move gearshift lever to neutral position and check position of shift indicator. If pointer is not aligned with N on display, slide anchor until
indicator is correct. Tighten screw and check for proper positioning of indicator in all positions.
25. Install bulkhead connector and connector attaching screw and connect column connector.
26. Install instrument panel support rod, tighten rod attaching screws and install instrument panel lower trim cover.
27. Connect battery ground cable.
28. Fill cooling system and charge A/C system.