Premier L4-150 2.5L (1988)
FIGURE 1
9.
Insert the CPS patch harness through the 1/2" drilled hole in the bulkhead and fully seat the CPS patch harness grommet (H) in the drilled hole.
Figure 1
FIGURE 4
10.
Locate the larger (32-way) of the two ECU harness connectors and note the location and color code of the wires in the C1 and D1 terminal
cavities. Remove the two wire locks (K) from the 32-way connector. Figure 4