eagle Workshop Repair Guides

Eagle Workshop Service and Repair Manuals

Relays and Modules - Ignition System > < Automatic Shut Down (ASD) Relay <--> [Main Relay (Computer/Fuel System)]|Locations|Page 82
Page 1
background image

Automatic Shut Down (ASD) Relay: Testing and Inspection

Fig. 89 Control relay coils L1 & L2 test chart. 4-89.6/1.5L

Fig. 90 Control relay coils L3 test chart. 4-89.6/1.5L

1.

 Check continuity between control relay terminals, Fig. 89, with relay coil energized and not energized. To energize coils, L1 and L2, apply
battery voltage across terminals 6 and 4.

2.

 Check continuity between control relay terminals, Fig. 90, with relay coil energized and not energized. To energize coil, L3, apply battery voltage
across terminals 8 and 4.

3.

 If test results are not satisfactory, replace control relay.

 

Relays and Modules - Ignition System > < Automatic Shut Down (ASD) Relay <--> [Main Relay (Computer/Fuel System)]|Locations|Page 82