Summit L4-1795cc 1.8L SOHC (1995)
ABS Main Relay: Testing and Inspection
Fig 93 Power Relay Location And Terminal Identification
1. Remove instrument panel under cover, then the power relay.
2. Check for continuity across power relay terminals as shown.
Fig 94 BS Power Relay Continuity Inspection
3. Compare results.
4. If continuity is not as specified, replace power relay.