eagle Workshop Repair Guides

Eagle Workshop Service and Repair Manuals

Evaporative Check Valve|Testing and Inspection|Page 4380 > < Purge Control Solenoid|Page 4376
Page 1
background image

Evaporative Check Valve: Testing and Inspection

Overfill Limiter (Two-way Valve) Operation

1.  Remove the mounting bolt.
2.  Disconnect the vapor hoses and then remove the over fill limiter.
3.  Blow lightly into the inlet and the outlet. If air passes through after a slight resistance then the valve is good.

Evaporative Check Valve|Testing and Inspection|Page 4380 > < Purge Control Solenoid|Page 4376