eagle Workshop Repair Guides

Eagle Workshop Service and Repair Manuals

Canister Purge Solenoid > < Purge Control Valve <--> [Canister Purge Control Valve]|Locations
Page 1
background image

Purge Control Valve: Testing and Inspection

1. Remove the purge control valve.

2. Connect a hand vacuum pump to the vacuum nipple of the purge control valve.
3. Apply a vacuum of 53 kPa (16 in.Hg.) and check airtightness.
4. Blow in air lightly from the evaporative emission canister side nipple and check conditions as follows:

Hand vacuum pump vacuum

Normal condition

0 kPa (0 in.Hg.) (No vacuum

Air does not blow through 

is applied)

27 kPa (8.0 in.Hg) or more

Air blows through

5. Connect a hand vacuum pump to the positive pressure nipple of the purge control valve.
6. Apply a vacuum of 53 kPa (16 in.Hg) and check airtightness.

Canister Purge Solenoid > < Purge Control Valve <--> [Canister Purge Control Valve]|Locations