Aspire L4-81 1.3L SOHC (1994)
INSTALLATION
1. Install a new washer on the sensor.
2. Install the sensor into the manifold. Tighten to 25-29 Nm (19-21 lb ft).
3. Connect the ECT sensor electrical connector.
4. Install the upper intake manifold bracket and bracket bolts. Tighten to 19-26 Nm (14-19 lb ft).
5. Refill the cooling system and check for leaks.
6. Connect the battery ground cable.