Contour L4-122 2.0L CNG DOHC VIN Z SFI (1996)
cotter pin slot and insert new cotter pins.
23. Lower vehicle.
24. Remove three bar engine support.
25. Remove mechanics wire retaining radiator to upper support.
26. Tighten left and right front strut upper mounting nuts to 46 N-m (34 lb-ft).
27. Install two remaining TWC converter exhaust nuts. Tighten nuts to 40 N-m (30 lb-ft).
28. Position exhaust heat shield, coolant tube, and hose retainers. Install three heat shield bolts and one stud. Tighten retainers to 10 N-m (89 lb-ft).
Position A/C hose bracket to stud, securely install nut, and insert oil level indicator.
29. Install engine intake air resonator, one bolt, and two nuts. Connect MAF sensor and securely tighten hose clamp to inlet tube.
30. Fill power steering system.
31. Install front wheel assemblies.
32. Lower vehicle.
33. Check operation of system.