Contour V6-153 2.5L VIN G (24 Valve) SFI (2000)
2. Using the special tools, install the clutch field coil.
3. Install the A/C compressor pulley bearing and the A/C pulley.
4. Install the pulley snap ring with the bevel side out.
5. Place one nominal thickness shim inside the hub spline opening.
6. Slide the drive plate onto the compressor shaft.