Crown Victoria V8-281 4.6L SFI (1998)
1.
Clean around the tooling hole and all other holes in the area on the frame rail located between the upper and lower trailing arm-mounting brackets
(Figure 17 and 18).
2.
Apply duct tape over the holes.
3.
Pierce a 6 mm (1/4") hole into the duct tape covering the outer tooling hole to allow easy introduction of the nozzle into the tooling hole through
the tape (Figure 19).
4.
Lower the vehicle to chest height.
NOTE
IT IS SUGGESTED THAT GLOVES BE WORN WHEN WORKING THE HEATED TUBES OF MOTORCRAFT STRUCTURAL FOAM AS
OUTLINED IN STEPS 5 THROUGH 7. ADDITIONALLY, THE STRUCTURAL FOAM WILL CAUSE THE SIDE MEMBER SURFACE TO
BECOME VERY WARM AS A RESULT OF THE CHEMICAL REACTION.