Crown Victoria V8-4.6L VIN W (2000)
9. Apply a bead of Urethane Sealant Essex 400-HV or Essex U-216 meeting Ford specification WSB-M2G316-B to the pinch weld.
CAUTION: If the vehicle is to be driven within 24 hours of urethane sealant application, Urethane Sealant Essex U-216 meeting Ford
specification WSB-M2G316-B must be used due to its one hour cure time.
10. Using the alignment marks install the windshield glass.
CAUTION: Open a window to prevent the windshield glass from being pushed out by air pressure when a door is closed.
11. After the glass is set, check for water and air leaks through the urethane sealant and add urethane sealant where needed.
12. Install the front portion of the headliner.
13. Install the interior rear view mirror. For additional information, refer to Mirrors
14. Install the instrument panel defroster opening grille assembly.
^
If equipped, connect the electrical connectors.
15. Install the windshield side garnish mouldings.