ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Valve Cover - LH|Page 2572 > < Valve Cover - LH|Page 2570
Page 12
background image

16. Install the EGR valve tube.

^

Hand-tighten the upper and lower fittings.

^

Tighten to 50 Nm (37 ft. lbs.).

17. Connect the 2 differential pressure feedback EGR sensor vacuum hoses to the EGR valve tube.

All engines 

18. NOTE:  4.6L shown, 5.4L similar.

Position the crankcase ventilation tube and connect the quick connect coupling to the valve cover. For additional information, refer to Fuel
Delivery and Air Induction.

19. Install the ACL and air cleaner outlet pipe. For additional information, refer to Fuel Delivery and Air Induction.
20. Install the engine cover.

Valve Cover - LH|Page 2572 > < Valve Cover - LH|Page 2570