E 150 V8-4.6L VIN W (2006)
8. Rotate the tensioner clockwise and install the accessory drive belt onto the generator pulley.
9. Install the 8 ignition coils and the 8 bolts.
^
Tighten to 6 Nm (53 inch lbs.).
10. Connect the 8 fuel injector electrical connectors.
11. Connect the 8 coil-on-plug electrical connectors.
12. Install a new TB adapter gasket, position the TB adapter assembly and tighten the 4 bolts in 2 stages.
^
Stage 1: Tighten to 9 Nm (80 inch lbs.).
^
Stage 2: Tighten an additional 90 degrees.
13. Connect the EVAP vapor hose quick connect coupling. For additional information, refer to Fuel Delivery and Air Induction.
14. Connect the vacuum harness connector.