E 150 V8-4.6L VIN W (2006)
5. Remove the pressure control solenoid (PC-A).
1
Remove the (E) retaining clips from the pressure control solenoid (PC-A) and the shift solenoid (SSPC-C).
2
Partially slide the shift solenoid (SSPC-C) back enough to gain clearance to remove the pressure control solenoid (PC-A).
3
Remove the pressure control solenoid (PC-A).
Installation
1. Assemble the main control valve body.
1
Install the pressure control solenoid (PC-A) and install the (E) retaining clip.
2
Push the bulkhead connector through the solenoid body and twist the bulkhead connector locking it into place
3
Install the shift solenoid (SSPC-C) back into place and install the (E) retaining clip.
4
Connect the electrical connectors to the pressure control solenoid (PC-A) and the shift solenoid (SSPC-C).
5
Install the wire harness to solenoid body and tighten the bolts.