ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Evaporative Emissions System > < Catalytic Converter|Description and Operation|Page 2802
Page 2
background image

Exhaust System - Exploded View, Stripped Chassis (5-Speed Transmission) (Part 2)

Removal and Installation

NOTE: Exhaust fasteners are of a prevailing torque design. Use only new fasteners with the same part number as the original. Torque values must be
used as specified during reassembly to make sure of correct retention of exhaust components.

1. With the vehicle in NEUTRAL, position it on a hoist. For additional information, refer to Maintenance/Service and Repair.
2. Support the muffler and tailpipe assembly with a safety stand.
3. Release the front muffler and tailpipe and, if equipped, the extension pipe hanger isolators.
4. Loosen the muffler and tailpipe or, if equipped, the extension pipe-to-catalytic converter Torca(R) clamp.

^

To install, tighten to 55 Nm (41 lb-ft).

5. Remove the muffler and tailpipe and, if equipped, the extension pipe from the catalytic converter.
6. Disconnect the catalyst monitor sensor electrical connector.
7. Remove the 3 exhaust Y-pipe-to-catalytic converter nuts and discard. Remove the exhaust Y-pipe-to-catalytic converter support bracket.

^

To install, tighten the new nuts to 40 Nm (30 lb-ft).

8. Remove the catalytic converter from the exhaust Y-pipe and discard the gasket.
9. To install, reverse the removal procedure.

^

If a new Torca(R) clamp needs to be installed, install the new Torca(R) in the same orientation as the original.

Evaporative Emissions System > < Catalytic Converter|Description and Operation|Page 2802