E 150 V8-5.4L (2008)
Installation
1. NOTE: Lubricate the EPC solenoid O-rings with clean transmission fluid.
Install the EPC solenoid, bracket and bolt.
^
Tighten to 10 Nm (89 lb-inch).
2. Inspect the lead frame for damage.
^
Using the special tool, check all lead frame solenoid connections. The gauge should fit tightly and not fall out after being inserted.
^
If the special tool passes through any lead frame connector pins or does not feel like it makes a good contact, install a new lead frame.