E 150 V8-5.4L (2008)
2. Tighten the bolts in the sequence shown.
^
Tighten to 10 Nm (89 lb-inch).
3. Install the 8 coasting booster valve shuttle balls.
2. Tighten the bolts in the sequence shown.
^
Tighten to 10 Nm (89 lb-inch).
3. Install the 8 coasting booster valve shuttle balls.