E 150 V8-5.4L (2008)
2. Remove and discard the solenoid body electrical connector O-ring seal.
3. Remove the main control valve body electrical harness.
^
Remove the 2 bolts.
^
Disconnect the electrical connectors.
^
Lift the tab and twist and push the bulkhead connector through the solenoid body.
^
Remove the solenoid body electrical harness.
4. NOTE: Mark the location of each solenoid for correct installation.
Remove the E-clips and remove the solenoids.