E 150 1/2 Ton Van V6-4.2L VIN 2 (1997)
6. Connect the water pump bypass hose.
1. Position the water pump bypass hose.
2. Position the hose clamp.
7. Connect the fuel lines, if necessary.
8. Connect the fuel pressure regulator vacuum line.
9. Install the IMRC motors.
1. Install new linkage retainer clips and connect the linkages.
2. Position the brackets.
3. Install the two bolts on each bracket.
4. Connect the vacuum hoses.
10. Install the upper radiator hose to the lower intake manifold.