E 150 1/2 Ton Van V6-4.2L VIN 2 (1997)
2. Install the generator brush and terminal holder and the voltage regulator.
1
Depress the brushes and insert a wire to hold the brushes during installation.
2
Position the generator brush and terminal holder and the voltage regulator.
3
Install the four voltage regulator screws.
4
Remove the wire.
3. Install the generator.