E 150 1/2 Ton Van V6-4.2L VIN 2 (1997)
11. Install the three output shaft seal rings.
12. Install the No. 8 needle bearing on the direct clutch cylinder.
13. Position the (A) direct clutch on the (B) output shaft.
NOTE: Direct clutch cylinder may be installed after the output shaft ring gear is installed to the output shaft hub.