E 250 V10-6.8L VIN S (2005)
3. Lift the tab on the bulkhead connector, twist and push the bulkhead connector through the solenoid body.
5. Remove the pressure control solenoid (PC-A).
1. Remove the (E) retaining clips from the pressure control solenoid (PC-A) and the shift solenoid (SSPC-C).
2. Partially slide the shift solenoid (SSPC-C) back enough to gain clearance to remove the pressure control solenoid (PC-A).
3. Remove the pressure control solenoid (PC-A).
Installation
1. Assemble the main control valve body.
1. Install the pressure control solenoid (PC-A) and install the (E) retaining clip.
2. Push the bulkhead connector through the solenoid body and twist the bulkhead connector locking it into place
3. Install the shift solenoid (SSPC-C) back into place and install the (E) retaining clip.
4. Connect the electrical connectors to the pressure control solenoid (PC-A) and the shift solenoid (SSPC-C).