E 250 V8-4.6L (2007)
1. NOTE: Lubricate the O-ring seal with clean engine oil prior to installation.
Using a new O-ring seal, position the oil level indicator and install the bolt and the nut.
^
Tighten to 10 Nm (89 inch lbs).
5.4L (2V) engine
2. NOTE: Lubricate the O-ring seal with clean engine oil prior to installation.
Using a new O-ring seal, position the oil level indicator and install the bolt.
^
Tighten to 10 Nm (89 inch lbs).
3. Install the front oil level indicator and tube support bracket nut.
^
Tighten to 25 Nm (18 ft. lbs).
All vehicles
4. Install the LH exhaust manifold.
5. Install the ACL outlet pipe and the ACL. For additional information, refer to Fuel Delivery and Air Induction.