E 250 V8-5.4L (2008)
All engines
5. Position the Y-pipe flange and install the 4 nuts.
^
Tighten to 40 Nm (30 lb-ft).
6. Connect the battery ground cable. For additional information, refer to Battery.
All engines
5. Position the Y-pipe flange and install the 4 nuts.
^
Tighten to 40 Nm (30 lb-ft).
6. Connect the battery ground cable. For additional information, refer to Battery.