Ford Workshop Service and Repair Manuals
HOME
FEATURES
MENU
INDEX
ABOUT US
Instrument Panel and Console|Page 5267 >
< Instrument Panel and Console
E 250 V8-5.4L (2008)
Starting and Charging
Power and Ground Distribution / Auxiliary Power Outlet / Component Information
Service and Repair / Instrument Panel and Console
Page 5266
Page 2
Installation
1. Connect the electrical connector.
2. Slide the power point socket into the retainer.
Starting and Charging
Power and Ground Distribution / Auxiliary Power Outlet / Component Information
Service and Repair / Instrument Panel and Console
Page 5266
Instrument Panel and Console|Page 5267 >
< Instrument Panel and Console