E 250 V8-5.4L SOHC VIN L (2004)
5. Disconnect the catalyst monitoring sensor harness connectors. Remove the harness bracket.
6. Remove the two nuts, one bolt and position the hanger aside.
7. Install a suitable high lift transmission jack.
8. Raise the transmission to gain access to the support insulator retainer bolt, remove the bolt and the support insulator.
9. Remove the extension housing and gasket.
1. Remove the bolts and nuts.
2. Remove the extension housing and gasket.
Installation