E 250 3/4 Ton Van V8-5.4L CNG VIN M (1997)
Hydraulic Control Assembly - Antilock Brakes: Service and Repair
Solenoid Valve Body
1. Disconnect the RABS valve electrical connector.
2. Remove the two hydraulic lines and plug them.
3. Remove the two RABS valve nuts.
4. Remove the RABS valve.
RABS Valve Installation
5. Follow the removal procedure in reverse order, noting the following:
^
Bleed the brakes. See: Brake Bleeding/Service and Repair