E 250 3/4 Ton Van V8-5.4L CNG VIN M (1997)
27. Install the water outlet hose and reposition the clamp.
28. Fill the cooling system.
29. Install the engine cover.
30. Reconnect the battery ground cable.
NOTE: When the battery has been disconnected and reconnected, some abnormal drive symptoms may occur while the powertrain control
module (PCM) relearns its adaptive strategy. The vehicle may need to be driven 16 km (10 miles) or more to relearn the strategy.