E 250 3/4 Ton Van V8-5.4L CNG VIN M (1997)
2. Install the generator brush and terminal holder and the voltage regulator.
1
Depress the brushes and insert a wire to hold the brushes during installation.
2
Position the generator brush and terminal holder and the voltage regulator.
3
Install the four voltage regulator screws.
4
Remove the wire.
3. Install the generator.