E 250 3/4 Ton Van V8-5.4L CNG VIN M (1997)
3. Install the front disc brake rotor shield.
4. Install the front disc brake hub and rotor and the disc brake caliper.
5. Using a new cotter pin, install the tie rod end in the front wheel spindle.
6. Install the tire and wheel assembly.
7. Check the toe setting.