E 250 3/4 Ton Van V8-5.4L CNG VIN M (1997)
3. Install the torque converter with the installed leak check tool into the press.
4. Secure the press. Apply enough force from the press to seal the tool into the torque converter.
WARNING: Always follow proper safety procedures while using the press.
5. Apply a maximum of 80 psi air pressure to the valve on the leak check tool.
NOTE: Use clean, dry shop air.
6. With air pressure applied to the valve, inspect for leaks at the studs, the seams and the pilot hub. A soap bubble solution can be applied around
those areas to aid in the diagnosis. If leaks are present, replace the converter.
7. Remove the air hose. Release the pressure, and then slowly release the press.