E 250 3/4 Ton Van V8-5.4L CNG VIN M (1997)
5. Remove the (A) bolts and the (B) retainer.
INSTALLATION
1. Install the (A) retainer and the (B) bolts.
2. Lower the transmission jack while aligning the (A) retainer studs with the holes in the (B) transmission support crossmember. Allow the full
weight of the transmission to rest on the transmission support crossmember.
3. Install the nuts.