E 250 Van L6-300 4.9L (1984)
2.
Start engine and allow to reach operating temperature, then measure resistance across switch terminals.
3.
A change in resistance should be noted at cold and warm engine temperature readings.
4.
Check vacuum portion of switch as described above.