ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Suspension > < Steering Column|Removal and Installation|Page 5206
Page 1
background image

Sector Shaft: Adjustments

PITMAN SHAFT OVERCENTER PRELOAD

1.

Perform steps 1 through 3 of ``Worm Bearing Preload, Adjust'' procedure.

2.

Rotate worm shaft from one extreme to the other while counting total number of turns. Turn worm shaft back halfway to center gear.

3.

Using inch pound torque wrench, rotate worm shaft approximately 90 degrees across center. Highest reading should be within specifications listed
at end of section. Turn sector shaft adjusting screw until proper specification is obtained.

4.

Hold sector shaft adjusting screw and tighten locknut to 25 ft. lbs.

Suspension > < Steering Column|Removal and Installation|Page 5206