E 350 V10-6.8L (2007)
5. Remove the support.
Rivet Replacement
NOTE: Rivets that are removed will be replaced with the next larger size bolts.
1. NOTE: Drill only where a rivet was removed.
Drill a bolt hole in the support and the frame in the following sequence.
1
Line drill a hole the size of the bolt through the old rivet hole (for example, for 7/16-in diameter rivets, use a 1/2-in drill, 3/8-in or 10-mm
rivets, use a 7/16in drill).
2
Position the support.
3
Insert the bolts, nuts and washers (Property Class 9.8 metric [Grade 8]) in the drilled holes (at least 2 threads on the bolt must protrude through
the components).
4
Tighten the bolts.