E 350 V10-6.8L VIN S (2006)
13. Connect the 10 fuel injector electrical connectors.
14. Connect the fuel rail pressure and temperature sensor electrical connector and vacuum connector.
15. Connect the vacuum connector.
16. Connect the heater coolant hose.
17. Install a new TB adapter gasket and the TB and adapter as an assembly. Tighten the 4 bolts in 2 stages.
^
Stage 1: Tighten the bolts to 9 Nm (80 inch lbs.).
^
Stage 2: Tighten the bolts an additional 90 degrees.