E 350 V8-4.6L SOHC VIN W (2005)
7. Remove the bolts and the TB.
-
Discard the TB gasket.
Installation
All engines
1. Install a new TB gasket, position the TB and tighten the four bolts in two stages.
-
Stage 1: Tighten to 9 Nm (80 lb-in).
-
Stage 2: Tighten an additional 90 degrees.
5.4L engines
2. Connect the coolant hoses.
3. Fill and bleed the engine cooling system.
All engines