E 350 V8-5.4L (2008)
16. Connect the upper radiator hose.
17. Position the crankcase ventilation tube and connect quick connect coupling to the LH valve cover.
18. Install the TB spacer.
19. Connect the fuel supply tube spring lock coupling.
20. Install the engine cover.
21. Connect the battery ground cable. For additional information, refer to Battery.
22. Fill and bleed the engine cooling system.