E 350 V8-5.4L (2008)
Removal
1. With the vehicle in NEUTRAL, position it on a hoist.
2. Remove the transmission main control valve body.
3. Remove the solenoid body electrical connector O-ring seal.
4. Partially remove the solenoid body electrical wire harness.
1) Remove the wire harness-to-solenoid body bolts.
2) Disconnect the electrical connector from the pressure control solenoid (PC-A) and the shift solenoid (SSPC-C)
3) Lift the tab on the bulkhead connector, twist and push the bulkhead connector through the solenoid body.
5. Remove the pressure control solenoid (PC-A).
1) Remove the (E) retaining clips from the pressure control solenoid (PC-A) and the shift solenoid (SSPC-C).
2) Partially slide the shift solenoid (SSPC-C) back enough to gain clearance to remove the pressure control solenoid (PC-A).
3) Remove the pressure control solenoid (PC-A).