E 350 V8-6.0L DSL Turbo VIN P (2004)
32. Install the conduit and bolts.
^
Install the wiring harness into the conduit and connect the push pin.
^
Install the bolts.
^
Connect the locking tab.
33. Connect the electrical connector push pin. Position back the ground wire and install the bolt.
Vehicles with single generator
34. Install the accessory drive belt.
Vehicles with dual generator
35. Install the generator with mounting bracket and bolts.