Econoline E150 1/2 Ton V6-4.2L VIN 2 (1998)
NOTE: The manual control lever must be in the NEUTRAL position.
7. Tighten the bolts.
8. Install the manual control lever.
1. Position the manual control lever.
2. Install a new outer manual lever shaft nut.
9. With the manual lever in OVERDRIVE, connect the shift cable.
10. Install digital TR sensor electrical connector.
11. Install the filter and transmission fluid pan.
12. Remove the supports and lower the vehicle.
13. Reconnect the battery ground cable.
14. Fill the transmission with fluid and inspect for proper operation.