Econoline E150 1/2 Ton V6-4.2L VIN 2 (1998)
Valve Body: Service and Repair
REMOVAL
1. Disconnect the battery ground cable.
2. Raise and support the vehicle.
3. Drain the transmission fluid. Remove the transmission fluid pan, filter and seal.
4. Disconnect the molded lead frame from the sensors.
1. Disconnect the shift solenoid SSA/SS1 and SSB/SS2.
2. Disconnect the Torque Converter Clutch (TCC).
3. Disconnect the Electric Pressure Control (EPC) solenoid.
4. Disconnect the bulkhead inter connector.
CAUTION: Do not pull on the plastic lead frame. This may cause damage to the connector ends. Carefully pry up on the locking tabs to
disconnect the sensors. Disconnect the molded lead frame from the sensors.
5. Remove the shift solenoid and the Torque Converter Clutch (TCC) solenoid.
1. Remove the bolts.
2. Remove the shift solenoid and the Torque Converter Clutch (TCC) solenoid.