Econoline E150 1/2 Ton V8-4.6L SOHC VIN W (2001)
Blower Motor Switch: Service and Repair
Main Climate Control
Main Climate Control
REMOVAL
1. Disconnect the battery ground cable.
2. Remove the center trim panel; refer to Dash Board.
3. Remove the control assembly.
1
Remove the screws.
2
Remove the control assembly.
4. Remove the A/C-heater function selector switch knob.
5. Disconnect the vacuum harness connector.