Econoline E150 1/2 Ton V8-5.4L CNG VIN M (1998)
4. Remove the two screws.
5. Remove the vacuum control motor.
1. Lift up on the vacuum control motor arm to disengage it from the door crank.
2. Remove the vacuum control motor.
INSTALLATION
1. Follow the removal procedure in reverse order.