Econoline E250 3/4 Ton V6-4.2L VIN 2 (1998)
4. Install the accessory drive belt idler pulley.
5. Install the camshaft synchronizer.
6. Raise the vehicle.
7. Install the bolts.
4. Install the accessory drive belt idler pulley.
5. Install the camshaft synchronizer.
6. Raise the vehicle.
7. Install the bolts.