Econoline E250 3/4 Ton V6-4.2L VIN 2 (1998)
8. Connect the fuel pressure regulator vacuum line.
9. Install the IMRC motors.
1
Install new linkage retainer clips and connect the linkages.
2
Position the brackets.
3
Install the bolts on each bracket.
4
Connect the vacuum hoses.
10. Install the upper radiator hose to the lower intake manifold.
11. Connect the EGR valve vacuum hose.
12. Install the EGR valve tube upper fitting.
13. Connect the electrical harness.
14. Install the upper intake manifold.