Econoline E250 3/4 Ton V6-4.2L VIN 2 (1998)
2. Connect the molded lead frame to the sensors.
-
Connect the bulkhead inter connector.
-
Connect the electronic pressure control (EPC) solenoid.
-
Connect the torque converter clutch (TCC).
-
Connect the shift solenoid SSA/SS1 and SSB/SS2.
3. Install the manual control lever.