Econoline E250 3/4 Ton V6-4.2L VIN 2 (1998)
3. Install the transmission insulator and retainer.
4. Install the harness bracket. Reconnect the catalyst monitoring sensor harness connectors.
5. Install the VSS.
1. Install the VSS.
2. Install the bolt.
3. Connect the electrical connector.
6. Install the driveshaft.
7. Remove the supports and lower the vehicle.
8. Connect the battery ground cable.