Econoline E250 3/4 Ton V6-4.2L VIN 2 (1998)
7. Connect the molded lead frame to the sensors.
-
Connect the bulkhead inter connector.
-
Connect the electronic pressure control (EPC) solenoid.
-
Connect the torque converter clutch (TCC).
-
Connect the shift solenoid SSA/SS1 and SSB/SS2.
8. Replace fluid filter and seal as required.
CAUTION: If installing a new filter, and the grommet remains in the main control bore, carefully use a small screwdriver to remove the
grommet. Use care not to damage the main control bore.
NOTE: If transmission is being serviced for a contamination-related failure, use a new filter and seal.
9. Position the pan magnet into the transmission fluid pan.