Econoline E250 3/4 Ton V6-4.2L VIN 2 (1998)
6. Install progressively larger shims on the right side until the largest shim selected can be assembled by hand.
7. Install the right side bearing cap and tighten the left side and right side bolts to specification.
8. Rotate the differential case to make sure it rotates freely.
9. Use the Dial Indicator with Bracketry to measure the ring gear backlash.
-
If the backlash is within specification, go to Step 14.
-
If a zero backlash condition occurs, go to Step 10.
-
If the backlash is not within specification, go to Step 11.